Loading...

Why Us

Above & Beyond

As leaders in MMC, a dynamic and innovative construction technique, our work is precision- based and expertly planned to the millimetre so that everything seamlessly Clicks into place on the day.

Our specialist team is dedicated to applying the same values and approach to all aspects of our service. From appraisal and valuation through to planning and construction we go above and beyond to deliver a higher level of professionalism, making the whole experience feel smooth and effortless.

Enhanced Appearance and Facilities

No more roof repairs for the foreseeable future. As part of our package we may improve the existing facilities, such as lifts, stairwells and communal areas.

Build Time

From contract to occupancy, a Click Above development can take up to 60% less time than traditional build. As we use off site building methods and manufacture properties in a factory, our build time and scheduling are not affected by poor weather conditions. Our structural engineers ensure the existing building is sufficient and any on site disturbance is kept to the minimum. The finished properties are craned onto an existing building usually with a matter weeks, if not days.

Cost Predictability

Through well thought-out template design, we can be accurate with costs, avoiding un-planned, additional material or labour costs. This predicability means Click will not need to unprofessionally renegotiate mid term through a project or worse still find position of insolvency during a project.

Superior Quality

A factory environment ensures quality assurance is tested not only to withstand the demands of a traditional build, but also the stress of transportation and craning onto foundations. Each component is inspected at every phase and approved by third-party inspectors, complying with precise specifications and codes.

Greener, Smarter & Safer

When building in a factory, waste is eliminated by recycling materials, controlling inventory and protecting building materials. Because our properties are substantially completed in a factory-controlled setting using dry materials, the potential for high levels of moisture being trapped in the new construction is eliminated.

Building Information Modelling (BIM) is used in design and programme planning. Harnessing BIM Level 2 enables us to achieve optimum energy efficiency through intelligent virtual design team collaboration, enhanced manufacturing and site installation methodologies. Click only work with manufacturers and contractors who adhere to the ethos of Building Research Establishment Environmental Assessments Methodology (BREEAM), producing buildings that boast the utmost energy efficiency. Click also have the ability to implement 'Smart Home' technology within their developments, giving the occupier the ability to remotely control their use of electricity and gas, for example lighting and heating.

Less time on site also means less disruption to the local community. Removing approximately 80% of the building construction activity from the site location significantly reduces site disruption, noise, vehicular traffic and improves overall safety and security.

Minimum Disruption To Existing Buildings

here is minimal impact to the operational functionality of either the business or occupants of the existing building. The nature of 'build off site' construction minimises the typical inconveniences of traditional building sites.

Planning Policy

The Housing White Paper 'Fixing our broken housing market' (February 2017) states that not enough homes are being built and in order to solve the housing shortage (built up over many decades), a radical re-think of our whole approach to home building is required. As part of that 're-think', the document states that one of its aims is to diversify the housing market by seeking to 'promote more factory built homes'.